- May 3, 2014
- 55
- 2
My dealer called me this afternoon to let me know my target build week was March 9th. I put in my deposit on April 30th so it will be 11 months if all goes as planned.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
My dealer called me this afternoon to let me know my target build week was March 9th. I put in my deposit on April 30th so it will be 11 months if all goes as planned.
Thanks guys!
81Wayne, I originally ordered the Pacific package. However, after waiting and waiting due to constraints, I changed my order to a Z51 with all the available Pacific package options, plus magnetic ride control and PDR. It's a 2LT package, Torch red with black interior.
I going to order an after market ground package and install it myself.
Sweet sounds like an awesome combo. My proposed build, Z51, 2LT, A8, mag ride, front camera, personalized plate, switching back and forth between yellow (with black rims) or L/B (with Chrome rims) will install Z06 grill and steering wheel after, rear quarter Z06 air scoops, plus add some sort of ground effects package afterward. I hope my dealer gets the call to order within a few weeks.
My dealer called me this afternoon to let me know my target build week was March 9th. I put in my deposit on April 30th so it will be 11 months if all goes as planned.
wow that was quick thought it would take about 3 weeks