Some progress in the last week. Hole dug, footings in, walls formed and poured today. I have roughed in the drive a little further and a parking area along the back of the shop as well.
14 truck loads of concrete between 4:00 & 6:30 pm.
Bill
14 truck loads of concrete between 4:00 & 6:30 pm.
Bill
Attachments
-
2017-05-20-01.JPG57.3 KB · Views: 91
-
2017-05-20-02.JPG76.1 KB · Views: 90
-
2017-05-20-03.JPG82.6 KB · Views: 88
-
2017-05-20-04.JPG62.2 KB · Views: 89
-
House Construction 012.jpg615.8 KB · Views: 91
-
House Construction 013.jpg714.9 KB · Views: 89
-
House Construction 016.jpg778.4 KB · Views: 87
-
House Construction 017.jpg604.2 KB · Views: 88
-
House Construction 015.jpg797.8 KB · Views: 89