They hit 95 cars yesterday. If that keeps up we could see something like this in the future
My current TPW is July 27th. LOL. I knew it would puzzle people but I just had to do it.Murray, just curious why July 27th is in red?
Congratulations... I guess you moved up from your Aug. TPW then.My current TPW is July 27th. LOL. I knew it would puzzle people but I just had to do it.
I hope you do end up with that VIN, better than having to pay an extra $5K for a specific one. However, if you did chuck the extra cash, you would have had your car long ago, as those that picked that option got moved to the front of the buld line.I’m scheduled for July 27 as well Based on your estimate on vin numbers, I have a 1 in 900 chance of getting Vin 7854, birth date. Could only be better if I got it on my birthday Aug 7.
Good Morning Murray, Mark Riel just posted the VIN range as 3952 - 4044 on FB. Who is your source? Just trying to update my own spreadsheet and the data points are moving. Thanks.3954 to 4045 = 91
A little what-if-ing
If 2 shifts can average 88.6 each they can build 177 per day. So if the first shift can average 92 per day the second shift only needs to do 85.