This is a mobile optimized page that loads fast, if you want to load the real page, click this text.

Allocation

Lucky you! I'm the same but 9/12 TPW
That is quite a bit later than my TPW but until we hit 3300 things can still change quite a bit. I hope you get moved up for sure. Let us know when you go to 3100.
  • 1000 Order On Hold at Dealership
  • 1100 Order Placed at Dealership
  • 1101 Order Entered into System
  • 1102 Order Entered via Web
  • 2000 Order Accepted by Chevrolet
  • 2001 Order Generated to Dealer
  • 2005 Order Replaced with GM Prospec Order
  • 2030 Order Edited by Chevrolet
  • 2050 Order Changed
  • 2500 Order Preferenced (or “Picked Up” or “Imaged”), Sent to Production
  • 3000 Order Accepted by Production Control
  • 3100 Order Available to Sequence (now becomes more stable)
  • 3300 Order Selected and Scheduled for Production by Assembly Plant (Target Production Week usually available now)
  • 3400 Order Broadcasted for Production (Internal Plant Order Produced)
  • 3800 Vehicle Produced
  • 4000 Vehicle Available to Ship
  • 4104 Bailment Invoice Created
  • 4B00 Bayed (“B”, not 8)
  • 4106 Bailment Released
  • 4150 Vehicle Invoiced (Dealer Billed)
  • 4200 Vehicle Shipped
  • 4300 Intermediate Delivery
  • 4V03 Estimated Delivery Date
  • 4800 Rail Ramp Unload
  • 5000 Vehicle Delivered to Dealer
  • 6000 Vehicle Delivered to Customer
  • 9000 Order Cancelled
 

Similar threads

Users who are viewing this thread