Got my 40' culvert in dressed up with some 8'' on the ends. Driveway staked and excavated and 180tons of base spread. Will top dress with 3/4 in a year or so.
Shop foundation next as well as roadside and ditch grass clean-up.
Driveway is 20' wide 300' long with a good wide entrance.

Bill
Looking good Bill
 
Thanks Rob, lots of room for the RC stuff and I plan to have a little lounge area where the engines will go into showcases. TV, fridge, kettle, couch etc. all in that area. Wish I had the extra coin for one of those Big Ass fans, their cool!

Bill
 
Back filling perimeter and yesterday we put in and compacted 252 ton of 2'' crusher run. Once I have that compacted a bit more and a couple of rains, 60 ton of clear stone goes in before the floor pour.

Got my gate posts augered as well today and shaved down the front ditch grade for better mowing down the road.

Bill
 

Attachments

  • 2016-10-17 03.10.23.jpg
    2016-10-17 03.10.23.jpg
    57.5 KB · Views: 32
  • 2016-10-17 23.49.31.jpg
    2016-10-17 23.49.31.jpg
    51.5 KB · Views: 32
  • 2016-10-17 03.10.40.jpg
    2016-10-17 03.10.40.jpg
    51.7 KB · Views: 31
  • 2016-10-17 03.11.03.jpg
    2016-10-17 03.11.03.jpg
    67.7 KB · Views: 32
  • 2016-10-17 03.11.29.jpg
    2016-10-17 03.11.29.jpg
    78.1 KB · Views: 33
  • 2016-10-17 23.48.40.jpg
    2016-10-17 23.48.40.jpg
    47 KB · Views: 33
  • 2016-10-17 23.48.53.jpg
    2016-10-17 23.48.53.jpg
    69.8 KB · Views: 33
Concrete boys came around today to check my grade, chalk the line on the wall and drive some re-bar pins for the wire mesh.:Hurray:
They never had to move a single stone and were complaining that the stone base was compacted too hard as they were having trouble driving pins.;):Party::Party:
Concrete floor coming Tues or Wed depending on mother nature.:Hurray:


Bill
 
Last edited:
Floor is poured, all 30 metres of it. Slow setting today as it was fairly cool. Also poured my gate posts which took a metre and a half. Saw cutting Sat morning and framing lumber and trusses coming Thursday.
Thought I would be a nice guy and also ordered a toilet for next week. There's always someone that needs to take a dump in the midddle of the day. ;):Ack2:

Bill
 

Attachments

  • 2016-11-04 02.10.00.jpg
    2016-11-04 02.10.00.jpg
    61.1 KB · Views: 19
  • 2016-11-04 02.10.11.jpg
    2016-11-04 02.10.11.jpg
    52.2 KB · Views: 19
  • 2016-11-04 02.57.51.jpg
    2016-11-04 02.57.51.jpg
    41.6 KB · Views: 19
  • 2016-11-04 02.57.58.jpg
    2016-11-04 02.57.58.jpg
    48.9 KB · Views: 20
  • 2016-11-04 02.58.24.jpg
    2016-11-04 02.58.24.jpg
    42.9 KB · Views: 20
Bill,

Good for you on the POTTY, we built home in '78, first structure on the property
......" Johnny on the spot " do not recall what the rental fee was, Cleaned every
week... April - Oct ! The weather, could not be any better for you and crew.
 
Old Thread: Hello . There have been no replies in this thread for 100 days.
Content in this thread may no longer be relevant.
Perhaps it would be better to start a new thread instead.

Similar threads

Users who are viewing this thread