5/9
23,577 > 23,761 = 185

1652189769098.png
 
Mark has some interesting news!
"As of today the highest 2022 vin assigned is 26,165"
That would push 2022 production into the week of May 23. As we know TPW is "target or tentative production week"
There was a correction I just became aware of, The current highest vin is actually 25165. (Typo?)

5/10 BG
Production
23,762 > 23,938 = 177

1652276217652.png
 
Message from Mark.
5/11 BG
Production
Confirmed is
23,939-24,074
24,075-24,090 are non <domestic> so can’t confirm if they were built or not but I’d say they were.
1,074 left to go for 2022
👍

Still looking like 5/20 for the changeover to 2023

23,939 > 24,090 = 152 (Fixed an OOPS)

1652458501223.png
 
Last edited:
Old Thread: Hello . There have been no replies in this thread for 100 days.
Content in this thread may no longer be relevant.
Perhaps it would be better to start a new thread instead.

Similar threads

Users who are viewing this thread