Got my allocation last Friday when someone dropped out. Went status 3000 today. The order is a 2023 2LT convertible with Z51 and mag ride etc. Now wondering how long it will take to go to 3800 (built). First 2023’s will be produced starting tomorrow, May19th so things should move pretty quickly.