That is a pre- production mule that was going across the block. Rick will have his built the same time as everyone else on Feb 3Ok so I am afraid to ask this question because there is probably an easy answer, but how can a car be sold if they aren't even into production until February ?
In another thread, someone said the orange load that showed up at hq in oshawa had a 'production' vin, i.e. no 'EX'. (I'm doubting that) Did anyone get close enough in montreal to see the vin?That is a pre- production mule that was going across the block. Rick will have his built the same time as everyone else on Feb 3
Ah. Now see I knew there was a simple explanation. Thank you.That is a pre- production mule that was going across the block. Rick will have his built the same time as everyone else on Feb 3