C8 PRODUCTION CONSTRAINTS

Messages
3,679
Reaction score
10,320
VetteCoins
104,818
Car
STINGRAY 2016
Province
QC
Almost looks like they are having problems what with all the constraints
listed below

For the vehicles ordered the during the order cycle starting 09/12/19 the following constraints are in effect:

  • 1LT Preferred Equipment Group – 100% Constraint – Due to last about 10 weeks.
  • E60 Front Lift w/o FE4 Magnetic Ride Control – 100% Constraint – Due to last about 3 weeks.
  • GIE Long Beach Red Exterior – 100% Constraint – Due to last about 3 weeks
  • GS7 Elkhart Lake Blue Exterior – 100% Constraint – Due to last about 3 weeks
  • GAN Blade Silver Exterior – 100% Constraint – Due to last about 6 weeks
  • GDO Accelerate Yellow Exterior – 100% Constraint – Due to last about 6 weeks
  • GUI Zeus Bronze Exterior – 100% Constraint – Due to last about 6 weeks
  • GMO Rapid Blue Exterior – 100% Constraint – Due to last about 10 weeks
 
Old Thread: Hello . There have been no replies in this thread for 365 days.
Content in this thread may no longer be relevant.
Perhaps it would be better to start a new thread instead.

Similar threads

Users who are viewing this thread

Back
Top